Banking and financial infrastructure data integration

Banks need operational visibility of payment networks, ATMs, branches and messaging infrastructure without exposing customer data.

Example use case

An operations team monitors ATM device status through CEN/XFS events and IBM MQ statistics to spot cash-out and connectivity issues by region.

Typical sources and transports

ISO 20022 and ISO 15022 messages, FIX and FIXML, IBM MQ administrative statistics, CEN/XFS events, Avro and CDC from approved aggregate pipelines.

What the data means

Operational events need device and channel identity; financial messages should be reduced to approved metadata or aggregates.

Prerequisites

Before connecting banking and financial infrastructure sources, prepare an inventory of systems and owners, interface documentation for each one, read-only credentials and approved network paths. Agree identifiers, units and time zones early, and name a person who can confirm values against the source during commissioning.

Limitations

No transaction processing. Customer and payment data stay in source systems; regulatory channels are handled by the bank.

ALLINLET reads and normalises data; it does not control equipment.

Catalogue entries for this domain

The connector catalogue lists 44 entries for this domain. A selection is shown below. Listing indicates a possible integration path, not that it is implemented, validated or installed for your environment.

  • Acquirer-specific protocol
  • Atom / RSS feed
  • Avro
  • CAP (Common Alerting Protocol)
  • CDC · approved external aggregate pipeline
  • CDC · Debezium / mainframe connectors
  • CEN/XFS
  • ESA templates / national-authority channel
  • Exchange status feed
  • FIX
  • FIXML
  • Gateway logs
  • IBM MQ administrative statistics
  • ISO 15022 · MT5xx
  • ISO 20022
  • ISO 20022 via clearing / instant-payment platforms
  • ISO 20022 · camt.053 / camt.054
  • ISO 20022 · central-bank network

Further reading

Catalogue listings describe possible integration paths. Implementation and validation status is confirmed for each source during project scoping; no certification, service level or price is implied by this page.

Plan your data integration

Share your devices, protocols and network constraints, and we will propose a first validated connection.

Related pages