Manufacturing and industry data integration

Factories mix PLCs, machine controllers, quality systems, MES and ERP data, often from several decades of equipment.

Example use case

A plant connects andon calls and stop reasons, condition-monitoring readings and electricity meter data to understand which stoppages drive energy waste on a packaging line.

Typical sources and transports

OPC UA servers on PLCs and SCADA, Modbus TCP for meters, MQTT from IIoT gateways, B2MML schedules, EPCIS events, CMM result files and EDI documents.

What the data means

Machine states need clear state codes and durations; counters may reset at shift change; quality results link to part or batch identifiers.

Prerequisites

Before connecting manufacturing and industry sources, prepare an inventory of systems and owners, interface documentation for each one, read-only credentials and approved network paths. Agree identifiers, units and time zones early, and name a person who can confirm values against the source during commissioning.

Limitations

Read-only integration; no writes to controllers. Many listed sources are observation profiles that depend on the vendor system and are validated individually.

ALLINLET reads and normalises data; it does not control equipment.

Catalogue entries for this domain

The connector catalogue lists 66 entries for this domain. A selection is shown below. Listing indicates a possible integration path, not that it is implemented, validated or installed for your environment.

  • Additive-manufacturing observations
  • Aggregate safety-zone observations
  • Andon calls and stop reasons
  • B2MML V0701 schedule (structural XML)
  • BACnet/IP
  • Beckhoff PLC observations
  • CAD files and accompanying metadata
  • Carrier shipment observations
  • CMM result files
  • Condition-monitoring observations
  • EDI document acquisition
  • Electricity meter observations
  • Energy and material prices
  • EPCIS 2.0 JSON-LD latest 500 (not full genealogy)
  • ERP change events
  • Factory JSON MQTT snapshots
  • Factory Modbus TCP Security (units 1–8, 10–17)
  • Factory RTU over TLS (not local serial)

Further reading

Catalogue listings describe possible integration paths. Implementation and validation status is confirmed for each source during project scoping; no certification, service level or price is implied by this page.

Plan your data integration

Share your devices, protocols and network constraints, and we will propose a first validated connection.

Related pages